Low-Voltage Sliding Cable Power Conveying System II
2023-11-27


Today we will talk about commisioning of Low-voltage power conveying system

Installation and Commissioning

Equipment Installation

Carry out open-case inspection of equipment, propose handling suggestions to damaged or missing parts

Mark out or pop up cross curve as per the layout chart

Hoist and put the track in place as per the cross curve position

Splice tracks into an entire section by junction plate

Align and level the track, ensure space and track parallel

Install safety sliding cable and transducer box

Hoist drive trolley and driven trolley to the track, push the trolley back and forth, ensure the trolley runs smoothly

Install brush system and connect electric wires

Fix the track on the ground after all tracks and equipment are installed

Carry out a preliminary maintenance to the equipment

The equipment and distribution box must be connected by licensed technician