Today we will talk about commisioning of Low-voltage power conveying system
Installation and Commissioning
Equipment Installation
Carry out open-case inspection of equipment, propose handling suggestions to damaged or missing parts
Mark out or pop up cross curve as per the layout chart
Hoist and put the track in place as per the cross curve position
Splice tracks into an entire section by junction plate
Align and level the track, ensure space and track parallel
Install safety sliding cable and transducer box
Hoist drive trolley and driven trolley to the track, push the trolley back and forth, ensure the trolley runs smoothly
Install brush system and connect electric wires
Fix the track on the ground after all tracks and equipment are installed
Carry out a preliminary maintenance to the equipment
The equipment and distribution box must be connected by licensed technician